facebook-logo_001    

WE SUPPLY , DESIGN AND INSTALL :

……………………………………………………………………………………………………………………….

20180412_155334 20180412_164215 20180412_171637 20180417_133622 20180417_133806 20180417_134403

Home Cinema & Karaoke Systems @ kajang Bungalow

Heco home cinema speaker system , BMB karaoke system , 120″ perforated fixed screen and BenQ 4k Home Cinema projector

————————————————————————————————————

20180213_125033 20180213_154254 20180213_175818 20180213_23130220180227_140203 20180306_131631

Prince Court Medical Centre @ Jalan Tun Razak 

4 x 2 55″ Video setup with customised standing structure

——————————————————————————————————–

20180630_121059 20180630_130755 20180630_144932 20180630_144945

Film Editing Studio @ The Stand

Optoma UHD60 4K Projector with customized screen standing bracket


20170821_19024220170821_13043020170821_18321020170821_190147

Setia Eco City @ Yinson Holdings Berhad

Supply and Install 9feet x 12feet Grandview Motorised screen with epson 7500ansi lumens LCD projector and cabling work.

—————————————————————————————————–

20150423_110756[1]20150410_113958[1]20150410_121648[1]20150422_155858[1]20150216_163802[1]20150422_131818[1]20150422_124800[1]20150409_123915[1]

Mitsui Outlet Park @ KLIA

Supply and Install Customised LEd Standing bracket with high standard installation works.

—————————————————————————————————-

20180906_114047 20180906_114149 20180906_121225 20180906_154551 20180906_171741 20180906_185652 20180906_185703 20180906_190821

Muar – Bungalow

Supply and Install Home cinema & Karaoke system

—————————————————————————————————-

20180628_130326 20180628_130351 20180628_130425 20180628_161043

Gamuda Office @ PJ Trade Centre

Installing Epson Laser ultra short throw projector.

—————————————————————————————————-

20160524_16272620160505_14521120160303_141801 20160504_151014 20160505_134836 20160505_135510

Bank Negara @ Subang

Supply and Install Customised 4 X 3 Standing structure with installation works

—————————————————————————————————–

20161112_182858 20161112_18312620161112_12494020161112_18122220161112_18124720161112_182829

Menara Bangsar UOA 

Installation for ceiling motorised lift with epson projector and wiring works.

—————————————————————————————————–

20180706_144729 20180706_144927 20180706_131142 20180706_122146 20180706_110942 20180706_101417

Yakin Invest – Jalan Balakong

Supply and install epson touch & pen interactive projection system with customised furniture backdrop

—————————————————————————————————–

20170520_114316 20170520_114636 20170520_114835 20170520_115757

3Q Equestrian Centre @ Rawang

Supply and install FBT speaker system

——————————————————————————————————

20181124_132513 20181207_120527 20181207_120717 20181214_105456

Menara Prudential

Supply and install epson 4200ansi lumen projector with 10ft x 10ft screen

——————————————————————————————————

20181226_111453 20181226_161809 20181226_161831 20181226_162041

Setia Eco Glades @ Cyberjaya :

Supply and install Epson Home Theatre EH-LS100 Full HD Ultra-short Throw 3LCD Laser Projector ,

Heco Speaker systems , 110″ Fixed screen & Denon X2500 7.2 Channel AV receiver.

——————————————————————————————————————————–

20181205_110545 20181205_145712 20181205_161015 20181205_161037

Rawang Bungalow :

Supply and install Epson Home Theatre EH-LS100 Full HD Ultra-short Throw 3LCD Laser Projector

with grandview home cinema screen

————————————————————————————————————————-

20170517_111725 20170517_111739 20170517_144734 20170516_125915

Sungai kantan @ Kajang

Supply and install home cinema system 5.2.2

——————————————————————————————————

20160929_112729 20170112_132410 20170112_132758 20170112_132814

Ambrosia Residence @ Puchong

Supply and install home cinema systems.

—————————————————————————————————-

20170826_121315 20170826_151502 20170826_153000 20170826_154110 20170826_154855 20170826_174025

Wisma Cosplant 2 @ Nippon Express (M) sdn bhd

Epson shot throw Interactive projection setup

——————————————————————————————————

20170914_172526 20170914_103726 20170914_123855 20170914_164047

Shah Alam @ Seksyen 13

Customised 133″ Fixed perforated screen ceiling mount bracket with BenQ shot throw full HDprojector with cabling works

———————————————————————————————————-

20181029_110606 20181029_123407 20181029_143108 20181029_143118 20181029_143146 20181029_154736

Jalan Kelang lama – Semi-D

Supply and install karaoke & Home theater system

—————————————————————————————————————-

20150525_113014 20150518_174147 20150519_182036 20150525_133259

MOP Shopping Mall @ KLIA

Supply, Video mapping and Install Customised 6 x 2 LED Tv Standing bracket with high standard installation works

————————————————————————————————–

20170802_111710 20170802_152859 20170802_153025 20170802_171116

Semi-D @ sierra 16 puchong :

Supply and install Epson EH-TW8300 4K Enhance Home cinema projector and 133″ Tab tension motorized screen

————————————————————————————————–

20180424_105740 20180424_114728 20180425_134920 20180425_154421

VIP Lounge  :

To supply and install projection system with Myway karaoke system

—————————————————————————————————————–

20181130_140844 20181130_141723 20181130_141606 20181113_151939

Moulmein Rise Tower @ Penang  :

To supply and install projection system 6ft x 6ft screen

—————————————————————————————————————–

20170125_120148 20170125_120213 20170125_120418 20170125_120517

Fortuna Palace Seafood Restaurant @ Kajang

Supply and install audio visual systems

————————————————————————————————–

20171030_124136 20171030_124410 20171030_145108 20171030_145112

Setia Eco Park @ Shah Alam

Supply and install Home theater system ,& karaoke system

————————————————————————————————————–

20170113_173557 20170123_141904 20170123_142109 20170111_174135

Church @ Ara Damansara office block :

Supply and install PA systems.

——————————————————————————————-

20170829_164721 20170926_124334 20170926_151512 20170926_220713

Seremban :

Supply and install 7.2.4 Home cinema systems with dual 15″ magnat subwoofer , epson 4k enhance home cinema projector ,JBL studio 5 series speaker system , Denon X6400 , Oppo 203 player , earthquake ceiling speaker ,and 4k media player.

—————————————————————————————————-

20151218_13190220151218_151227

20151218_154024 20151218_13212520151216_174022 20151216_17405020151216_131916 20151216_16455520151208_152811 20151208_212232

VADS Building @ Taman Tun

Supply, Video mapping and Install Customised 5×2 LED Tv Standing bracket with high standard installation works

———————————————————————————————————————–

20180310_150739 20180310_113443 20180310_162945 20180310_163014

Balakong :

Karaoke system & 5.1.2 Home theater setup

——————————————————————————————————-

20140123_152459 20140123_14575520140123_164121 20140109_11140420140124_135827_Richtone(HDR) 20140124_13074420140109_125308 20140123_154013

Expressionz showroom @ Jalan Yap Kwan Seng :

Supply and Audio Visual Equipment :

System :  Elipson Stereo system , Epson 3D Full HD lcd projector , Motorised projector lift , FBT  Background Music system , Cocktail Audio, 150″ Motorised screen and Auralex Acoustics wall panel

——————————————————————————————————————–

20170124_181713 20170124_180809 20170124_170326 20170124_170323 20170124_133049 20170124_112036

Tiara Bungalow @ Markota Cheras :

Installation of Epson tw8300 4k Home Theater Projector , 133″ tab tension motorised screen , 60″ led tv and heco speaker and marantz av receiver.

————————————————————————————————-

20171206_153417 20171206_162015 20171206_162220 20171206_162510

Villa Perdana @ Kajang

Myway karaoke system , Mipro karaoke system , epson full hd projector and 110″ tab-tension screen

——————————————————————————————————————-

2014-06-02 17.31.43 2014-06-02 21.04.57 2014-06-02 21.31.16 2014-06-02 23.18.24

Kuala Lumpur City Gallery :

Supply And Install 4200ansi lumen projector – Multi Screen Display

————————————————————————————————-

20170918_150457 20170918_163859 20170921_102518 20171009_121541 20171009_130645 20171009_132518

ACE Credit @ Setia Eco Park :

Supply And Install LG55″ 3 x 2 Video wall System

——————————————————————————————————-

20180115_123825 20180115_123951 20180115_120312 20180115_113613

Bungalow @ Desa Park City

5.1.2 Home Theater System Setup

110″ Fixed screen , epson 3d full hd lcd projector and installation works.

—————————————————————————————————–

20170221_161433 20170404_134749 20170417_151326 20170417_151341

Klang Bungalow :

Home Cinema and karaoke Systems

——————————————————————————————————

20160104_160150 20160104_175735

20160105_180721 20160113_161233 20160113_161249 20160113_161302

Yes College Academy @ Mega Avenue 2 :

Supply and install audio visual system for classroom

———————————————————————————————–

20171221_12325320171221_150558 20171221_15072320171221_150509

Bungalow @ Hulu Klang Ampang :

Epson 4k Enhance Home cinema projector , 120″ Fixed screen , Elac Uni-Fi series speaker system ,

Earthquake atmos ceiling speaker  and cabling works.

————————————————————————————————————

20170607_110812 20170607_112748

20170607_111655 20170607_113136

20170607_100307 20170606_154314.

Causeway Link – Johor Headquarters :

LG 3 X 3 Videowall Systems ( LG47LV35A)

————————————————————————————————————–

20171007_162025 20171006_182741

Setia Eco Park @ Shah Alam :

Supply and install 7.1.2 Home theater system with epson Tw8200 full HD projector , Elac speaker system and

bmb karaoke system with sound selection systems.

20150817_162328 20150819_141256 20150820_190631 20150820_191942

Showroom @ NidoZ :

Epson 6500ansi LCD projector with curved projection setup with FBT audio system.

————————————————————————————————–

20181218_105723 20181218_140026 20181218_144600 20181218_151325

Kajang Bungalow @ Ridgeview Resindence :

Epson Home cinema projector , Myway karaoke system , JBL speaker & 133″ Fixed screen

————————————————————————————————–

20170304_121932 20170304_123002 20170304_185234 20170304_190351q

Bangunan Ambank Group :

Installing 6meter projector lift and projector.

———————————————————————————————

20160609_121713 20160609_121810

Metro Tabernacle A/G Church @ Gombak

Installation for 14feet x 14feet motorised screen and panasonic 7000 ansi lumens projector with customised bracket

————————————————————————————————

20151024_125452 20151024_125916 20151024_130308 20151024_141509

JT International Bhd

Supply and install 80″ Full HD LED tv , Glass panel design and cabling works.

———————————————————————————————–

20160621_123814 20160621_125526 20160621_145159 20160621_145413

Subang Condominium :

Home Theater System Setup

————————————————————————————————–

20180113_150813 20180113_164026 20180113_164152 20180113_165424

20180106_125737 20180106_164113

MRT Site Office @ Sungai Besi

Supply and install 3X3 Videowall System

——————————————————————————————————

20150505_171035 20150507_131552 20150507_132910 20150507_134550

Sri Petaling Bungalow :

Supply ,65″ sharp led tv , Home karaoke System and home theater system.

————————————————————————————————–

20150713_111810 20150713_120302 20150713_144637_Richtone(HDR) 20150713_144724_Richtone(HDR)20150713_111819 20150713_144909_Richtone(HDR)

Melacca Bungalow :

Customised AV equipment rack with powder coating surface , Eltax 5.1 home cinema system ,

Mipro Karaoke system , 120″ Fixed screen , denon player , marantz av receiver , epson tw6600 3d full

HD lcd projector , , DIY wall acoustic panel with back led light and wiring works.

—————————————————————————————————-

20150110_100635 20150110_103101 20150110_122144 20150110_125655

Oil and Gas Corporate Office :

Installing 80″ Full HD LED TV  with ISO safety standard installation works.

————————————————————————————————–

20150908_144326 20150905_133154 20150911_112715 20150908_144843

ESTHETICS INTERNATIONAL GROUP BERHAD

Multi Purpose Hall Audio Visual Setup :

Epson 4500ansi lumen lcd projector , yahama , FBT 15″ pro speaker , kempton amplifier , 10feet x 10feet  motorised screen

and installation works.

—————————————————————————————————-

20161018_141949 20161227_141922 20161227_142135 20161227_143427

PARAMOUNT PROPERTY SHOWROOM :

Supply and install 3 x 3 super slim bezel tv wall , audio systems for background music , projector and screen installation.

————————————————————————————————-

20141210_105505 20141210_112152 20141210_112419 20141208_143707

Residential @ Jalan TunRazak :

Installing Epson EB 4950wu (4500ansi) High Ansi WXGA full hd projector

—————————————————————————————————-

20181219_162716 20181219_165957 20181219_170209 20181219_175824

Bungalow @ Hijauan Residence :

Installing Epson 4K Enhance home cinema projector , 120″ Fixed screen Heco speaker system , marantz 9.1 channel AV receiver , Acoustic wall panel & installation works.

——————————————————————————————————————————

20160617_104055 20160617_130040

Jabatan Kastam Putrajaya :

PA System Setup

————————————————————————————————-

20180623_101353 20180623_111921 20180623_115156 20180623_124140 20180623_173043 20180623_173202

3 x 3 Videowall system @ Titiwangsa

Supply and install 3 x 3 videowall system with customized tv structure  carpentry works

————————————————————————————————-

20150126_155335 20150126_163321 20150126_155107 20150126_154935

Residential :

Installing BMB Karaoke Audio System And Myway Karaoke Jukebox Song Selection System.

—————————————————————————————————

20140617_164913_Richtone(HDR) 20140617_123412 20140617_155844 20140617_143635

 Serdang Hill :

System : JBL 7.1 Es series , Haman kardon avr365 av receiver , 119″ Fixed wall screen , Denon universal 3d

Blu-ray player , Epson TW-6100 3D Full HD projection and Installation work.

————————————————————————————————–

20140905_135640 20140905_134804 20140905_134429 20140905_134916

Coach @ pavillion office tower :

Supply and install : Extron VGA splitter , Kramer hemi extender , Panasonic 4000ansi lumen projector , 7ft x 7ft motorised screen and cabling works.

————————————————————————————————

20140814_152120 20140814_152143

Ampang Bungalow :

Supply and install : BMB karaoke system with 106″ Draper fixed screen and panasonic full hd projector

————————————————————————————————-

20141028_113628 20141028_132436

20141105_131440 20141105_131925

Gallery Tuanku Ja’afar (seremban)

Supply , Design and Install auralex wall acoustic panel

————————————————————————————————-

20151030_105859 20151030_120934 20151030_172456 20151030_172515 20151030_172728 20151030_173944

Corporate Multipurpose Hall @ Shah Alam :

Customised Speaker/Projector bracket with powder coating surface , HDMI extender , 10feet x 10feet motorised screen , Kempton italy speaker , audiocenter 8 channel power amplifier , yamaha audio mixer and cabling works.

——————————————————————————————————

20180511_105208 20180511_110039 20180511_135536 20180515_113948

7.1.4 Home cinema system setup :

Supply and install Heco speaker system , 133″ Fixed screen , epson tw5350 with installation work

——————————————————————————————————

2014-06-14 14.48.54 2014-06-14 14.53.08

Raintree Club Of Kuala Lumpur :

Supply and Install Projection System.

———————————————————————————————–

20160520_142844 20160520_14295120160519_120811 20160519_123152

Yes College Academy @ Mega Avenue 2 :

Supply and install 3 x 2 panasonic video wall setup

————————————————————————————————

20140106_142504 20140106_143939 20140106_143959 20140106_151108

Kajang Chinese Methodist Church :

Supply and install Audio Visual Equipment.

————————————————————————————————-

BASF-1 BASF-2BASF-3BASF-4

BASF @ Menara Telekom

Supply and install  18 meeting rooms with projector and cabling works.

————————————————————————————————–

CGC 1 CGC 2

20140805_152937 20140805_153007

Credit Guarantee Corporation (CGC Kelana Jaya) 

Supply , install , multi screen display with customised bracket , audio conference system and projector lift.

System : Panasonic projector , 7ft X 7ft Motorised screen , Projector Lift , Bosch Audio conference system.

————————————————————————————————-

Rapid Kuantan 1 Rapid Kuantan 2 Rapid Kuantan 3 Rapid Kuantan 4

Rapid Kuantan :

Supply and Install X 2 Panasonic 4000ansi lumen projector with motorised screen and cabling works.

————————————————————————————————

The Treez 1 The Treez 2 The Treez 3The Treez 420131209_125744 20131209_12572420131209_133323 20131209_133353The Treez 9The Treez 10

The Treez @ Bukit Jalil Green Condominium :

Supply and install for audio visual equipment.

*Gym area , Lobby , Sky lounge , Karaoke Area , Spa Area and Multi purpose Hall.

System : Kempton 15″ Full range speaker , Toa background music , Mipro and  DBX Audio processor , XTZ 5.1 system.

————————————————————————————————-

2014-05-20 17.01.57 2014-05-21 15.03.33

 BinaPuri Boardroom :

Supply and Install Projection system

————————————————————————————————-

IMG_1133 IMG_1137.

Bolton Studio @ Puchong :

Supply and Install sound system , 6ft X 6ft Draper motorised screen , 3M 5000 ansi lumens projector.

————————————————————————————————–

20140307_145903 20140311_110921 20140311_131530 2014-06-06 16.32.47

20140414_141356 20140414_142034

Jalan Ampang Bungalow :

Supply , Design and Install :

System : Karaoke 22″ touch screen system , 60″ Sharp full hd led tv , ID works ,

: install auralex pyramic wall acoustic panel and JBL Karaoke audio system.

————————————————————————————————–

20140212_133052 20140212_133107

Rawang Bungalow :

Supplier and Install BMB Karaoke system , 19″ Touch screen and Home Theater System.

—————————————————————————————————-

2014-05-14 16.16.14 2014-05-14 18.06.35

Gita Bayu Bungalow :

System : Denon 5.1 AV receiver , Boson Acoustic 5.1 speaker system and Toa pipe-in music.

————————————————————————————————-

Ton Fah-1Ton Fah-2  Ton Fah-3Ton Fah-4

Sekolah Jenis Kebangsaan (C) Ton Fah Beranang :

Supply And Install PA System for whole school.

————————————————————————————————–

20130617_12212420130617_122132    20130613_162317_resized 20130613_165253_resized

MUHIBBAH ENGINEERING (M) BHD :

Supply and Install Epson latest interactive projector and cabling works .

X 5meeting room ,  X1 Boardroom.

————————————————————————————————-

20130711_182509 20130711_182523 20130711_182537 20130711_190248.

YonMing AUTO (Nilai) Sdn Bhd

Supply and install Ben-Q projector and 8feet x 8feet motorised screen and cabling works.

————————————————————————————————–

Avare 1 (7) Avare 1 (8) Avare 1 (9) Avare 1 (13) Avare 1 (14) Avare 1 (15).

AVARE CONDO @KLCC :

Supply and install Toa Weather proof Garden speaker with out door cabling.

————————————————————————————————–

20130703_235646 20130703_172509.

20130913_155134 20130914_190015

ZEBRA SQUARE @ KL :

Supply and install Pro Sound , Kempton power amplifier , Kempton 15″ full range speaker , audio mixer , Panasonic 8000 ansi lumens projector , installation works 35feet and above and customised powder coating bracket.

————————————————————————————————-

20130627_110715 20130627_110709 IMG_canaan  (7) IMG_canaan  (8).

Canaan Church @Sri Hartamas :

Install and supply EV mini array speaker system and projection system.

————————————————————————————————

20130320_182210_resized 20130320_184641_resized.

20131008_104321 20131008_12282520131008_123420 20131008_151914

Kolej Vokasional Kajang :

1) Supply and install Sharp 2800ansi lumens DLP projector and JBL Studio series 5.1 system at multimedia room ,

and Denon 5.1 AV receiver.

2) Customised powder coating  portable screen structure and PA system.

—————————————————————————————————

IMG_1417 IMG_1422 IMG_1415 IMG_1426

Bomba Putrajaya :

Installing 103″ Panasonic Monitor TV with customised wall bracket.

————————————————————————————————-

20140121_161354 20140121_171743

Desa Park City @ Kepong :

Supply and Install BMB Karaoke System , 60″ Sharp full HD led tv , JBL Sound Bar.

————————————————————————————————–

20130615_114446 20130615_125137 20130615_131443 20130615_131952.

Mahkota Cheras Bungalow :

Karaoke system with touch screen and  JBL Karaoke system.

————————————————————————————————–

20130312_133037_resized 20130308_120451_resized (1) 20130312_133052_resized 20130312_133128_resized.

Sentosa Height @ Kajang :

Supply and install Karaoke system , touch screen , 119″ Fixed wall screen , BMB Karaoke System and

Disco lighting.

————————————————————————————————

20180103_165829 20180119_132202 20180119_170110 20180119_182128

Johor Bharu Centre :

2 x 2 Video setup with customised wall structure

—————————————————————————————————–

2014-06-04 12.42.16 2014-06-04 13.59.40 2014-06-04 16.03.12 2014-06-04 16.28.52

PJ ss15 Bungalow :

Supply and install projection system

System : Epson TW-8200 3d full hd projector and 92″ Fixed wall screen.

————————————————————————————————-

20130119_133631 20130119_133654

Perdana residence 2 @ Selayang :

Stereo System : Transparent speaker ,Tangent CD Player , Tangent Amplifier and Yaqin Tube amplifier.

————————————————————————————————

20131217_152109 20131217_153240

 Seri Pilmoor @ Ara Damansara :

Supply and install Karaoke system , 5.1 home theater system , 22″ Karaoke Touch screen , 106″ Fixed wall screen ,

Ben-Q HD projector and BMB  Karaoke System.

—————————————————————————————————

Mahkota cheras-1 Mahkota cheras-2 Mahkota cheras-3 Mahkota cheras-4

Mahkota Cheras :

Supply and install Karaoke system , touch screen , 83″ Fixed wall screen , Ben-Q HD projector , K-Party Karaoke System and Disco lighting.

—————————————————————————————————

phot0 001 (228) phot0 001 (230).

Airasia Office

Install and cabling works for Multi screen display.

————————————————————————————————–

IMG_1411 IMG_1412 IMG_1413 IMG_1408

IQKL (Taman Tun) :

Supply and install projector ,  manual pull down screen and cabling works.

————————————————————————————————

IMG_1346 IMG_1293 IMG_1301 IMG_1303 IMG_1310 IMG_1315 .

R & B Pub (Muar)

Supply and install karaoke system.

————————————————————————————————

phot0 001 (94) IMG_1051 phot0 001 (86) IMG_1049

Menara Exxon Mobil :

Supply and install audio visual equipment

————————————————————————————————-

IMG_0666 IMG_0656 IMG_0661 IMG_0660

MMU Melaca :

Supply and install Mitsubishi 6000ansi lumens projector/motorised screen.

————————————————————————————————–

IMG_0704 IMG_0697 IMG_0696 IMG_0699

Kong Hoe SRJK Klang :

Supply and install Panasonic 6000ansi lumens projector , 16Feet X 16Feet Motorised screen and Customised 50feet Drop Motorised projector lift.

———————————————————

Q-sentral :

Supply and install 5 x 2 (L-shape videowall systems)

——————————————————–

Mesiniaga Berhad :

Supply and install Pa system & Projection system

——————————————————–

Bungalow @ Kota Kemuning


To Supply and install karaoke system with myway and JBL systems.  

——————————————————–

BMB Speaker system @ Saujana Impian :

Suppy and install bmb karaoke system with Polkaudio 12 active subwoofer

———————————————————

Port Dickson Methodist Centre

Supply and install epson 5000ansi lumens LCD projector and cabling works

——————————————————–

Masjid Sultan Inskandar @ Johor Bahru

———————————————————

To supply and install Mipro karaoke systems

———————————————————

Eco majestic semenyih 5.1.2 Home cinema systems

——————————————————–


Affin Bank Berhad @ KL

Supply and install audio&visual systems with 3room combination systems

——————————————————–

Myway karaoke with JBL speaker system @ Sri Hartamas

To Supply and install karaoke system with myway and JBL systems.

———————————————————

Lake View Point Resident @ Cyberjaya

Supply and install Home cinema systems for condominium facility hall

———————————————————

Bangsar South : Common ground

Projection system : Epson 4000ansi lumens projector , 10feet motorised screen and cabling work with GI conduit

——————————————————–

Vasayo @ PJ8

Supply and install Projection and PA systems